Brimtoy Clockwork Breakdown Lorry Tin Plastic Vintage Toy Windup

£12.99

Discount per Quantity

QuantityDiscountPrice
2 +10%£11.69

Out of stock

Free UK shipping, always!

  • 30 days easy returns
  • Order yours before 12pm for same day dispatch
Guaranteed Safe Checkout

Brimtoy Clockwork Breakdown Lorry Tin Plastic Vintage Toy Windup
Brimtoy Clockwork Breakdown Lorry Tin Plastic Vintage Toy Windup
£12.99

Vintage Brimtoy Clockwork Breakdown Lorry – Red Tin & Plastic Windup Toy 🚛

Made in the 1950s in the United Kingdom, this Brimtoy clockwork breakdown lorry is a charming piece of vintage toy history. The truck features a classic red color, with a unique tin and plastic construction that’s sure to add a nostalgic touch to any collection.

Measurements:

  • Length: 9.5cm
  • Width: 4cm
  • Height: 4.5cm

Condition:

  • Used with signs of cosmetic wear consistent with its age.
  • The hoist/winch is bent and doesn’t turn.
  • Please see all pictures for details before purchasing.

A great collectible for vintage toy enthusiastsBrimtoy collectors, or those seeking to add a unique 1950s windup toy to their collection!

Shipping & Policies:

*Please see pictures for more details.

*The photos show the actual item being sold; no stock photos are used.

*Same-day dispatch for orders placed by 12 PM; next-day dispatch for later orders.

*99% of parcels are sent tracked: 85% via 48-hour service, 15% via 24-hour service.

*90% of parcels are shipped with Royal Mail; the remaining 10% with Parcelforce.

*Large letters and letters provide proof of delivery but are only tracked if the total price exceeds £20.

*Buyers should contact us first if any issues arise.

*We reuse packaging materials while ensuring items are well-protected.

Additional information

Brand

Brimtoy

Color

Red

Reviews

There are no reviews yet.

Be the first to review “Brimtoy Clockwork Breakdown Lorry Tin Plastic Vintage Toy Windup”

Your email address will not be published. Required fields are marked *